DOMINANT System Integrators (DSI) IT task is to design and build a Data center that will serve the business needs of our client deploying an efficient with optimum running speed and 100% in-service operation. Where all the information technology and network resides, is the “backbone” of any business. It becomes essential that the design and implementation al of its elements – power, cooling, security, fire protection, structured cabling and physical housing, be deployed as an integrated, logical system that guarantees visibility and multiple service contact among all of its elements.

Designing & Housing Phases By Our Specialists
  • Site survey and selection, raised floor, electromagnetic shielding
  • Secure sheltering, Structure cable system (frames, racks, trays)
  • Energy delivery system (UPS, PDUs, Generators cooling, etc)

Technical design criteria considerations consist of:

  • Open architecture
  • Physical factors
  • Full system integration
  • Able to support new technology
  • Adaptive to incremental growth
Plan Design Build Handover
Provide needs assessment Site selection Procurement management Integrated testing
Business requirements Risk analysis Design compliance Factory tests
Check technology Design drawings Risk management Documentation
Solution feasibility Understanding specifications Time management Training
Create budgets Initiate procurement process Change management Creation of knowledge base
Certified Professionals

DSI has certified professionals on board which help businesses assess their data center and support infrastructure risks, provide recommendations for improvement and offer accurate project cost estimating and guidance throughout implementation. In today`s competitive markets, where organization`s measure network downtime in lost profits, DSI designs solutions that protect against some of the leading causes of downtime, hardware damage, data loss, and decreased productivity. DSI sets the standard for right solutions for data centers.

A good plan is critical for a successful data center design project. The data center design process starts with our client`s management staff determining the business`s data center objectives and availability requirements. We follow with a thorough survey of the existing systems and facilities. We then work with the IT staff and the facility staff to identify and quantify the data center project needs and combine them with our understanding of the trends and migrations strategies required to adapt to future changes.